7 Things to Check Before Extending Your Landed House
A house extension adds real value and space, but problems usually show up a year later: a leak at the roof joint, a crack between old and new walls, or water pooling at the back. Check these seven things before you build.

1. Is the existing structure strong enough?
For an upper-floor extension, the existing columns, beams and foundation must carry the new load. Get a structural check first.
2. The joint between old and new
The new structure settles differently from the old house. A proper expansion joint and good waterproofing stop cracks and leaks where the two meet.
3. Roof and flashing
Most extension leaks come from the roof joint. Ask how the new roof will tie into the old one and insist on a water test before handover.
4. Drainage and floor levels
The new floor should match the old one, and rainwater must flow away from the house to the drain, not towards your back door.
5. Setback, boundary and permit
Know your boundary and the council’s setback rules before you design. Read do I need a permit for a house extension in Malaysia?
6. Termite treatment
Treat the soil before the slab is cast. It is cheap to do now and very expensive later.
7. One team responsible for the result
When the designer, the structure and the builder are different parties, problems at the joint become an argument. With a design & build company, one team is responsible from drawing to handover.
KAIU’s extension work
KAIU is an interior design & build company in KL. See our kitchen extension in Seri Kembangan, home extension in USJ and our full house extension service.
Call or WhatsApp 011-1309 3099 for a free site visit.
