House Extension in KL & Klang Valley: Design & Build

KAIU designs and builds house extensions for landed homes in Kuala Lumpur and the Klang Valley: kitchen extensions, rear and side extensions, car porch and wet kitchen add-ons, and upper-floor extensions. One in-house team handles the design, structure, permit drawings, construction, roofing, carpentry and finishing, so you deal with one company from the first site visit to handover.

Landed house interior design and build with extension in USJ by KAIU
Interior design & build with house extension by KAIU, USJ Subang Jaya

Types of house extension we build

Kitchen extension with glass roof in Seri Kembangan by KAIU
Kitchen extension by KAIU, Seri Kembangan

Our house extension process

  1. Free site visit: we measure the house, check the land boundary, drainage, existing structure and roof, and listen to how you want to use the space.
  2. Design and 3D: layout, 3D visuals, roof and facade design so the extension looks like part of the original house.
  3. Structure and permit drawings: structural design and the drawings the local council needs. We work with a registered architect or engineer for the council submission.
  4. Quotation: one itemised quotation for design and build.
  5. Construction: foundation, structure, brickwork, roofing, waterproofing, M&E, plastering, tiling and carpentry, managed by one project manager.
  6. Handover: final checks, water test on the roof and wet areas, defects cleared.

Why choose a design & build company for your extension?

An extension is part design, part structure. Most problems come from the join between old and new: roof leaks, cracks between the old wall and the new wall, poor drainage and uneven floor levels. When one team designs and builds, the same people who draw the joint are the ones who build it and fix it if anything goes wrong.

How much does a house extension cost in KL?

As a guide, a single-storey kitchen or rear extension in the Klang Valley usually costs about RM250 to RM400 per sq ft for the structure, roof and finishes. A typical 150 to 300 sq ft kitchen extension is around RM40,000 to RM90,000, and more with full wet and dry kitchen cabinets. Upper-floor extensions cost more because of the structural work. Cost depends on size, foundation type, roof, finishes and how much built-in carpentry you add. We give a full itemised quotation after the site visit.

How long does it take?

Council approval usually takes about 1 to 3 months. Construction takes about 6 to 10 weeks for a single-storey kitchen extension and about 3 to 5 months for an upper-floor extension.

Do I need a permit?

Yes. In Malaysia, a house extension normally needs building plan approval from your local council (for example DBKL in Kuala Lumpur, MBPJ in Petaling Jaya, MBSJ in Subang Jaya, MPKj in Kajang). Read our guide: Do I need a permit for a house extension in Malaysia?

3D design of a landed house extension in Seri Kembangan by KAIU
3D design for a landed house in Seri Kembangan by KAIU

Areas we cover

Kuala Lumpur and the Klang Valley: Cheras, Bangsar, Kepong, Setapak, Wangsa Maju, Petaling Jaya, Subang Jaya, USJ, Puchong, Seri Kembangan, Shah Alam, Klang, Kajang and Putrajaya.

Why KAIU

Book a free site visit

Call or WhatsApp 011-1309 3099, email info@kaiu.my or contact us.

Free quote? Chat with us